BrightBuilt Barn

<

Quick Facts

General

Location <
Building Type s
Project Type Z
Basis of Performance Claim Modeled,
Bedrooms 2
Conditioned Floor Area 7

Energy Summary

Energy Data Type Estimated,
Renewable Energy System Type(s) Photovoltaics,
Ratings <
Annual renewable energy generated 1

Envelope and Mechanicals

Subslab assembly
Foundation wall assembly
Above grade wall assembly <
Door Assembly
Air Changes per hour, ACH50

Project Team:

Other Team Members:

Ratings:

<

Awards:

Completion

Completion Date: <

Scope

<
Type of Construction New,
Number of buildings 1
Floor area of each building 7
Bedrooms 2
Stories 1
Conditioned Building Volume
Conditioned Floor Area 7

Location and Climate Details

s

Address <
Location Type S
Climate Region Z
Köppen Climate Type D
Lat. / Long. P
Elevation 8
Solar Insolation 3
Annual CDD and Base Temp 4 | 6
Annual HDD and Base Temp 7 | 6

Site

Site Conditions:

previously undeveloped land,

Site Description:

Monthly Energy Data and Utilities

Energy Data Type: Modeled,

Electric Utility:

Gas Utility:

Renewables and Energy Balance

Renewable Energy Sources:Renewable energy is generated within the building footprint (e.g. solar PV on the roof),

Renewable Energy System Description & Details: 6

Annual renewable energy generated 1
Annual Renewable Energy Generated Data Type Estimated,
Power Rating
Renewable Energy System Type(s) Photovoltaics,
Source of Annual Production Data e

Walls and Roof

<
Subslab assembly
Subslab R-value
Slab edge assembly
Slab edge R-value
Foundation wall assembly
Foundation wall R-value
Above grade wall assembly <
Above grade wall R-value 4
Cathedral ceiling assembly
Cathedral ceiling R-value

Windows and Doors

Window Assembly: <

Door Assembly:

Average window U-factor
Door U-Factor
Door Area

Mechanical Systems

Space cooling - Manufacturer & Model
Space heating - Manufacturer & Model
Domestic hot water - Manufacturer & Model
Domestic hot water - capacity
Ventilation - Manufacturer & Model
Lighting Manufacturer and Model
Lighting Efficiency
Mechanical Equipment Installation Details and Comments

Envelope

Air Changes per hour, ACH50
Air Changes per hour, CFM50

General Process

Design for Adaptability:

Software Tools

Software Tools:

General modeling information:

Lessons Learned

Outcome of Project Goals:

Discrepancies:

Rebates and Financial Incentives

Federal incentives
Local incentives
State incentives
Utility incentives
Other incentives
Top